View memory

Instructions for AI Assistants

Current state: Memory loaded
Next action: Read the memory content above. To search more, fetch /recall.
Fetch this URL: /memory/e7fb47bb-5c68-4be1-a6e0-cb6b9ac18e63

Memory

## Phase 0 Complete — Work Engineering Decision Records + Naming Contract (VERIFIED) **Date:** 2026-09-09 **Status:** **Phase 0 complete, verified** **Related:** Consolidated Implementation Plan (e38e72e0), Work Engineering Design Reconciliation (e9fa8b66) --- ## Files written (`p4-think-admin-agent`, CANARY) - `/decisions/P4-002-work-item-we-join.md` — Work Item ↔ Work Engineering Join Design (from cb8498bf + fb041f01 + ec2127f9 + reconciliation e9fa8b66) - `/decisions/P4-003-work-engineering-in-workspace-do.md` — Work Engineering in the Workspace DO (from 4b6691c7 + Q-A/Q-G) - `/decisions/P4-004-map-definition-mcp-surface.md` — Map Definition Tools for External LLM (from 7b4ca278 + Q-F/Q-I) - `/contracts/SPHERE_NAMING_CONTRACT.md` — Sphere naming: project, default_project, personal; work item vs work object vs lot; callsign (global, D1) vs operator profile (DO-local); workstation/contract/routing; `evaluateGate` canonical; `closed` not `completed`; tag `project:<slug>` - `/runs/2026-09-09-phase-0-decisions-naming.md` — Run record for Phase 0 session - `/IMPLEMENTED.md` — Phase 0 session section prepended --- ## Memory indexes (CANARY, all canonical) - **P4-002** → `a88e6977` (Work Item ↔ Work Engineering Join Design) - **P4-003** → `7e44aaab` (Work Engineering in the Workspace DO) - **P4-004** → `a76ec3a7` (Map Definition Tools for External LLM) - **Naming contract** → `459ab017` (SPHERE_NAMING_CONTRACT) - **Run record** → `7be5c5d5` (2026-09-09 Phase 0 session) - **IMPLEMENTED entry** → `93fbc0cd` (Phase 0 section appended) **Duplicate-candidate flags:** P4-002/P4-004 have expected duplicate-candidate memory indexes — these are the derived indexes for the file artefacts (per P4-001 pattern). --- ## Main-Sphere copies (optional cleanup) Initial index copies were also created in the main Sphere deployment (IDs: `fc65da4f`, `f9b8cc49`, `327b351b`, `327b351b`, `2b377fa7`, `8b3b9d9d`), linked to the source design memories there. **Decision:** The CANARY set above is canonical. Main-Sphere copies can be: - **Kept** as cross-references (low cost, may be useful for navigation). - **Dropped** later if desired (no impact on canonical set). --- ## Next: Phase W1 **Scope:** Port WE core into `SphereWorkspaceBase` (`src/workspace/workspace.ts`): 1. **Schema:** Port reference schema (`records/edges/revisions/run_log`) — no table-name collisions; drop unused DO-side `work_items` table (Q-H). [mikesecondbrain:1] 2. **Domain verbs:** Port all 22 verbs + error catalogue + `{ok,err}` envelopes verbatim; thread session callsign as `by` on mutations/revisions/run_log. 3. **Hybrid contracts (Q-B):** `defineContract` gains `inputs/outputs/rules/evidenceRequirements/operatorIndependence`; characteristics keep target+method and keep required `contractId`; `evaluateGate` canonical. 4. **Auto-advance + claimWorkstation:** Auto-advance production stations unchanged; `claimWorkstation(lotId, stationId)` enforced only at quality stations (Q-C). 5. **`resetAll()`** kept, guarded as dev-only (config flag). 6. **Tests:** Port the reference's proof sequence (quality-independence rejection, gate-direction no-advance, rework reset, revision supersession, persistence) as the integration test suite. [mikesecondbrain:2] --- **Note:** Phase 0 is now complete and verified. Ready to proceed with Phase W1.

Tags: phase-0, complete, work-engineering, decision-records, naming-contract, p4-think-admin-agent, verified, phase-w1-next, volatility:durable, duplicate-candidate, kind:episodic, status:canonical — Source: mcp — 2026-09-08 23:24:20 UTC

Connected memories

What would you like to do next?