Memory
Run record: 2026-09-09 Phase 0 — decisions & naming contract (callsign p4-prep). Consolidated the Work Engineering design thread into canonical artefacts before any code: /decisions/P4-002-work-item-we-join.md, /decisions/P4-003-work-engineering-in-workspace-do.md, /decisions/P4-004-map-definition-mcp-surface.md, /contracts/SPHERE_NAMING_CONTRACT.md. Basis: perplexityoutputs/ audit (9 files, read-only), Mike's naming locks, five design memories (cb8498bf, fb041f01, ec2127f9, 7b4ca278, 4b6691c7), Q-A..Q-I reconciliation (e9fa8b66), and the validated Work Engineering Map v0 reference (C:\CoderFiles\work-engineering-database). Phases locked: W1 = WE core port into SphereWorkspaceBase; W2 = join columns + status mirroring + grouped MCP tools + provisioning + audit fixes; W3 = deferred backlog. Canonical artefact at /runs/2026-09-09-phase-0-decisions-naming.md in project p4-think-admin-agent.
Tags: type:run-record, phase:p4, worksphere:p4-think-admin-agent, purpose:design-consolidation, volatility:durable, project:p4-think-admin-agent, kind:episodic, status:canonical — Source: mcp — 2026-09-08 23:21:31 UTC